Beijing Chuangxin Lianjie Network Technology Co., Ltd.
Products
Contact Us
  • Contact Person : Ms. Wang Melissa
  • Company Name : Beijing Chuangxin Lianjie Network Technology Co., Ltd.
  • Tel : 86-010-82345215
  • Fax : 86-010-82873504
  • Address : Beijing,Beijing,Room 7017, Shangdi Building, 30 XinxiRd., Haidian District
  • Country/Region : China
  • Zip : 100085

remote power 4 Ports

remote power 4 Ports
Product Detailed
Related Categories:Other Power Supplies
remote power 1.Approval:FCC,CE,ISO9001 2.Input:100VAC~280VAC,47Hz~63Hz. 3.Maximum output:75W. 4.output:13.8W

remote power

Features and functions

PROCET PT-PSE401 is a four ports concentrated network remote power supply implement.Built-in power supply, metal body. It is suitable for indoor, can work regularly between 100VAC ~ 280VAC. input voltage This power supply use super type 5 cable to connect with network terminal equipment, is suitable for 10/100 M network environment.

ModelPT-PSE401
System reliabilityMTBF>100k hours
No. of Ports4 Ports 
Temperature-15°C~+55°C
Relative humidity5%~90%RH 
Input voltage100VAC~280VAC,47Hz~63Hz 
Maximum output power75W 
Output voltage regulation accuracy-48VDC±2% 
Load regulation-48VDC±1% 
Dimensions154(W) x44 (H) x210 (D) mm 
Weight<3kg 
DC output voltage of broadband noise3.4kHz~150kHz≤50mv 0.15MHz~30MHz≤20mv
Range of output over-voltage protection-52VDC~-50VDC
Over-temperature protection>100°C 
Over-current protection(Single circuit)350Ma~400Ma 
Over voltage protectionInput voltage >290VAC~310VAC 
Over voltage recovery pointInput voltage > 285VAC
Under voltage protection<85VAC~90VAC 
Under voltage recovery point<100VAC 
Safety Approvals CE,RE,EN55022,CLASSB 
Discrete noise voltage:

3.4KHz~150KHz≤5mv

150KHz~200KHz≤3mv200KHz~500KHz≤2mv0.5MHz~30MHz≤1mv

Ethernet ports light instructionsRed light POWER on:Show power working normallyGreen light ACTIVE on: show equipment supply power normally

Green light in network port is on and then off after several seconds show overload protection or short circuit.

Red light shining slightly in use shows feed part of the network port is off-loads, can judge there is a glitch of the power supply or far-end equipment.

Installation and Commissioning

1. Insert the input power line into 100-220VAC introducing input socket.

2. Connect output signal line respectively3. Connect communicating & introducing line, signal wire, output lines tightly to avoid bad contacts and loose.

Note:Item 1: The installation site must be away from heat source and electromagnetism interference source, non-corrosive gas and metal dust.Item 2:Mustn’t block the cooling hole of the equipment.

Item 3: Installation must be stable fixed placing, not a violent shock.Item 4: Note whether the AC input voltage is during the range of 100VAC ~ 280VAC.Item 5: Prevent to crash and conflict with other equipment during the installation, so as not to causelocal damage of the machine surface.

Boot Test

1.Using resistance gears of millimeter to detect Ac input, short circuit phenomena did not exit; after loading, green light in output interface is on shows output normally. If it is off after several seconds shows short circuit and limited flow phenomena did exit.2. After electric communication, the working light in front board is on.

Daily maintenance and maintenance:

Long-distance power supply PROCET PT- PSE401 can work uninterruptedly,to guarantee the reliability of the power supply, must prepare daily maintenance work, make the power system in the best working state.1. Clean power source regularly to prevent dirt retention phenomenon

2. Check whether the connecting line of input and output is loose or contact undesirable, if damaged, please change in time.

Transportation:

In handling process please handle with care, do not make it strong impact.It should be placed strictly according to the direction of instructions in packing during transportation or may cause glitch or damage.

Storage:When storing, must be kept in dry warehouse, not exposure to sun and rain.Storage temperature:-5°C~+55°C (low temperature storage recovery time is at least 4 hours),Relative humidity:5% ~90%RH

remote power 4 Ports



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.